Data centre, comms and server rooms

These areas generally house sophisticated IT equipment where a high density of data cabling and services are converging and require frequent access to the floor void. A panel with a bonded integral finish – normally Vinyl or High Pressure Laminate – is required here. Bonded panels are designed for the rigours of constant lifting.

A panel with an integral finish means that the void can be accessed more quickly and easily as there are no carpet tiles to lift to gain access to the panel itself.

In the past, a number of different systems were used. We’ve seen 20-year-old vinyl bonded panels, which have been cleaned and maintained properly and are as good as new. Other systems, which were perhaps not bonded properly or had poor-quality finishes, have certainly fared worse.

To discuss your data centre, comms and server rooms requirements please call us on 01480 281000 or contact us.

< Back to Carrino contracts

News

  • Acclaim Accreditation
  • Builder's Profile
  • Veriforce CHAS
  • Constructionline
  • SafeContractor Approved
  • Tate
  • Mero-Tsk
  • JOSCAR Registered

Carrino and the environment

We care passionately about the environment and the impact that our business activities have on our local community. Take a look at our environmental initiatives.

Find out more

Carrino Goes Solar